This week saw the first column pour for the Dalry A737 bypass viaduct. The photo taken on Monday shows the preparations before the pour, this 10.8m column is the first of 8 required for the structure, ranging in heights of up to 14.5m. The column and abutment work carried out by Murform will support the main deck and once complete will cross a railway line and the River Garnock.