The sun is shining and preparations are underway for the first pour for the replacement capping beam along the River Clyde in Glasgow. This 2.5m deep and 1.25m wide section required some special details such as double-sided hanging platforms, single sided edge formwork with resin anchors and even some areas that required a boat for access.