Bhlaraidh Wind Farm
RJ McLeod, on behalf of SSE
Murform have recently secured this follow on project with RJ McLeod, following our success at Beinneun Wind Farm (which is less than 5 miles away).
Bhlaraidh Wind Farm is a 32 turbine site, situated in the Great Glen, just North West of Loch Ness. Due to its sensitive location, the site has been developed to cause minimal visual impact to the environment to avoid being seen from the main tourist routes and iconic attractions of the Great Glen. The sites remote location also provides it inherent challenges, for the supply of materials and access by labour to each turbine location, which will have to be overcome to achieve the projects required outputs.
Murform will construct the 32 bases, consisting of over 62 tonne of rebar and 580m³ of concrete in each base, with a strong effort to construct as many as possible before the winter weather sets in. To assist in this target, Murform have provided additional resources to the project. RJ McLeod will assist with full time cranes and also on site batching plants and trucks.