Ravenscraig Bridge

The project involved the construction of a new underbridge as part of works to upgrade the road connections between Motherwell and Ravenscraig for North Lanarkshire Council.

Murform constructed the 6,000-tonne bridge in a compound next to the West Coast Main Line for Network Rail and our client Story Contracting. The bridge was then transported under the adjacent railway line by our clients during a disruptive possession over Easter 2023.

A series of SPMT (Self-propelled modular transporters) transported the incredible main portal structure of the bridge, which measures 30m x 31m x 10m high.

Through early involvement, we were able to engage with the designers and our supply chain to provide a collaborative approach to the permanent and temporary works designs. This was a key element that allowed us to construct the main structure in an impressive 16 weeks, taking almost 2 months of our original programme. It also facilitated great planning and coordination with our team and client Story Contracting.

We completed 18 precast wing walls in addition to the main bridge structure. A substantial weight of 70 tonnes each and their towering height, exceeding 9 meters.

The successful completion of this monumental underbridge and its accompanying wing walls stands as a testament to our dedication to innovation, collaboration, and the pursuit of excellence in construction.

 

Link to Project Scotland Article: Business on top form in Ravenscraig bridge project

 

Project Type:

Bridges

Main Contractor:

Story Contracting Ltd

Location:

Ravenscraig to Motherwell

Project Value:

£16.9m